Related
Newsletter subscription
Subscribe to our free bimonthly newsletter for latest news about TDKv and the crane hire business:
Crane hire directory

More than 6.000 crane hire companies worldwide with complete address information (incl. phone, fax, e-mail, website) available on CD-ROM. With the International Crane Rentals Directory you will immediately find the suitable crane hire company for your lifting job in more than 80 countries.
International Crane Rentals Directory »
Scaled top views

NEW! Scaled top views for 75 current telescopic cranes manufactured by Liebherr, Terex-Demag, Tadano Faun and Grove in scale 1:100, 1:200, 1:250 and 1:500 in one book for your job site planning.
Planningfoils-Book 3 »
CAD crane blocks
CAD blocks top views and side views for mobile cranes as DXF or DWG-file for your jobsite planning.
Read more »
Advertising
Terex-Demag introduces CC 9800 crawler crane
This month crane manufacturer Terex-Demag will introduce the new CC 9800 crawler crane at the Zweibrücken factory. The crane is based on the known CC 8800-1. Rope system and hook block are already known from the bigger CC 8800-1 Twin. The new 1600 tonne crawler crane uses a 4 m wide boom system in order to gain a maximum load moment of 27000 tonne metres with attached superlift counterweight of 800 tonnes. The longest possible boom configurations are 156 m for the main boom and 120 m for the luffing jib. In combination the maximum lenght for the SWSL configuration is 108 + 120 m.
With 132 m of main boom and 18 m extension the crane fits perfectly for the assembly of the new Enercon E 126 wind turbines. This allows impressing lifting capacities of 360 tonnes to a hook height of 144 m.
The first customer, Sarens Group from Belgium, will take delivery of the new crane in January 2009. A second unit was already ordered from wind turbine manufacturer Enercon.
Tags: CC 8800-1 Twin - CC 9800 - Crane manufacturer - Crawler crane - Enercon - Sarens Group - SWSL - Terex-Demag - Wind turbines

crawler crane rental
We are looking for renting a crawler crane 600 metric ton with 1200 ton super lift for a period of six month for a project in Egypt.
Post new comment