TDKv - The service company for crane hire companies: Equipment guides, Crane hire directory, CAD blocks of mobile cranes

Newsletter subscription

Subscribe to our free bimonthly newsletter for latest news about TDKv and the crane hire business:

Crane hire directory

6000 crane hire companies worldwide

More than 6.000 crane hire companies worldwide with complete address information (incl. phone, fax, e-mail, website) available on CD-ROM. With the International Crane Rentals Directory you will immediately find the suitable crane hire company for your lifting job in more than 80 countries.
International Crane Rentals Directory »

Scaled top views

NEW! Scaled top views for 75 current telescopic cranes manufactured by Liebherr, Terex-Demag, Tadano Faun and Grove in scale 1:100, 1:200, 1:250 and 1:500 in one book  for your job site planning.
Planningfoils-Book 3 »

CAD crane blocks

CAD blocks top views and side views for mobile cranes as DXF or DWG-file for your jobsite planning.
Read more »

Advertising

Listed at

Blogverzeichnis - Blog Verzeichnis bloggerei.de Blog Top Liste - by TopBlogs.de

CC 1800

Landmark for Hareket

Turkey's leading heavylift company scored a double first when it erected a new gantry crane at an offshore yard in Tuzla in October. According to contractor Hareket Heavy Lifting & Transport, it was the heaviest load ever lifted in Turkey and the first time that a Turkish company had used strand jacks in Turkey. The gantry crane weighed 855t, stood 67.9m high and had a 55m span. Hareket also transported it 15km to the yard. For the engineered lift, the first leg, weighing 140t, was lifted using a Demag AC 700 telescopic crane with a 300t capacity Demag CC 1800 lattice crawler for tailing. A 175t capacity Ormig TG 175 lattice boom truck crane and a 100t telescopic crane supported each side of the shear leg. The second pier leg was lifted with the AC 700 and CC 1800 in tandem, with the TG 175 tailing. For the top beam of gantry crane, weighing 530t, four units of 200t capacity strand jacks were used. During the eight hour operation, lifting of the top beam was computer controlled from a control room on the ground, 150m away from the jacks.

Source: Connectingcranes.com



Syndicate content